EIA: Completeness Report

<< Click to Display Table of Contents >>

Navigation:  EQuIS Library > Reports > EarthSoft Standard Reports by Product > Standard with SPM > EIAs (EQuIS Information Agents) >

EIA: Completeness Report

Report Name: EIA: Completeness Report

File Name: EarthSoft.Reports.Library.48827.dll

Dependencies: Licensed SPM and SPM Schema

Software: SPM

Source: SPM install

Language: English

Output Type: Excel1

 

Description: The EIA: Completeness Results report can be used to configure EDD-triggered agents to check incoming EDDs for completeness. The report logic is based on the SPM - Completeness Report - Summary report, and presents similar input parameters.

 

Installation Instructions: This report requires a licensed SPM and the SPM Schema applied to the database. For SPM usage, no additional steps are necessary. This report is setup as an EQuIS Information Agent (EIA) only. Instructions on how to setup the SPM Completeness Report as an EIA are available here, and can be followed with slight modifications to setup this report. For Enterprise use, this report should be published to the database. When publishing the report, the assembly should be stored in the database. The report will be available for selection once it has been published.

 

Overview:

The report compares laboratory results in incoming EDDs against the expected results based on the task code selected in the report parameters, showing a list of results that are missing. The report generates output for each associated EDD until all expected results are received. For example, if 100 results are expected for the chosen task code and an incoming EDD contains 75 results associated with that task code, the report will generate output on the 25 remaining results. If a second EDD is received containing the remaining 25 results associated with the task code, the report will not generate output.

 

Source Tables DT_SAMPLE, DT_SPM_CONTRACT, DT_SPM_CONTRACT_MAG, DT_SPM_SCHEDULED_RESULT, DT_SPM_SCHEDULED_SAMPLE, DT_TASK

 

Report Parameters *

Plan Code

Parameter to select the sample plan code. Only plans with applicable tasks are shown.**

Check by Method

Check box for enabling check by method. Default: False.

Check by Lab

Check box for enabling check by lab. Default: False.

Check by Matrix

Check box for enabling check by matrix. Default: True.

Check by Fraction

Check box for enabling check by fraction. Default: True.

Check by Sample depth

Check box for enabling check by Sample depth. Default: True.

Check by SPM sys_sample_code

Check box for enabling check by SPM sys_sample_code. Default: False.

Add Task Client

Check box to add task client. Default: False.

A Simple results Summary Report

Check box to create a simple lab results summary report with C and I status. Default: False.

Included Unplanned Samples

Check box to include unplanned samples. Default: False.

EDD (ebatch)

Parameter for selecting EDDs.

 

* This report contains the following hidden parameter(s) that could affect the outcome of the report.:

Sample

Task Filter

Date Range

Start

End

Deparment(s)

Monitoring Program

Monitoring Type

Authority

Authority Type

Permit Number

Task Type

Priority Ranking

Person Name(s)

Company Code(s)

Project(s)

SPM Task Code(s)**

Type(s)

QC Type(s)

Matrix(es)

Delivery Group(s)

Result Type(s)

Test Type(s)

Non-detect Symbol

Reporting Limit

Individual(s)

Group(s)

 

If listed, the Additional Fields parameter may be customized as explained in How To Customize the Additional Fields Parameter.

 

Consult an EQuIS administrator if hidden parameters should be visible or use different default values in a published report (a report that allows saving of user reports). Hidden parameters cannot be viewed or changed in unpublished reports outside of a report parameter file.

 

**When run as an EIA, the plan code and SPM task code parameters are set based on the EBATCH number.

 

 

 

1Excel report output requires a valid license of Microsoft Excel to view the output.