EIA: Lab Results Completeness Report – A Simple Lab Results Summary Report Parameter Available [d40457]

Fixed a bug so that the "A Simple Lab Results Summary Report" parameter can be selected without generating an error message when running the "EIA: Lab Results Completeness" report.

 

 


 

 

SPM – Able to Open Crosstab Grid Reports [d41067]

Added functionality to open crosstab grid reports when using the Reports ribbon in SPM.

 

 


 

 

SPM – Allow Creating a New Other Activity for a Scheduled Task [d41909]

Fixed a bug in SPM to allow creating a new 'other' activity for a scheduled task.

 

 


 

 

SPM – Calendar – Rescheduling Scheduled Task Updates Related Samples and Activities [d40786]

Updated SPM Calendar so that changing a Scheduled Task date will update correctly. It will now display a loading bar when a Scheduled Task date change updates related Activities or Samples.

 

 


 

 

SPM – Change Help Link to Be Build-Specific [d41998]

Updated the SPM help link to open build-specific help articles.

 

 


 

 

SPM – Copy Activity to Another Task Fails for Scheduled Task [d41793]

Fixed a bug in the Scheduled Task window of SPM that occurred when trying to copy an activity to another task and the source activity's EQUIPMENT_CODE is null.

 

 


 

 

SPM – Could Not Reconnect to Database When "Reopen Last Plan" Option Was False [d40542]

Fixed an issue that occurred after changing the SPM Option "Reopen Last Plan" to False. An "infinite" loading bar would be produced when reconnecting to a database in SPM. Now, a menu of available plan actions (create, open, copy, rename) will display.

 

 


 

 

SPM – Grid Reports – Error Occurs When Reports Run in SPM [d43572]

Fixed a bug where running a grid report, such as "SPM - Completeness Table" report, in SPM caused an "Oops, Me._message doesn't tell me any reasons. Please contact Earthsoft!" error message to occur.

 

 


 

 

SPM – Hold Released Date Not Propagating to Scheduled Task [d42130]

Fixed a bug in SPM that prevented the scheduled sample release date from being populated when an "On Hold" sample was released before scheduling.

 

 


 

 

SPM – Make Statuses "Mark as Cancelled" and "Mark as Completed" Mutually Exclusive for Scheduled Tasks [d41849]

Fixed a bug in the SPM Scheduled Task window to ensure that the Mark as Cancelled and Mark as Completed check boxes are mutually exclusive, and thus, only one of these check boxes can be checked.

 

 


 

 

SPM – Planned Date Used by Sample Code Naming Schema Instead of Scheduled Date [d41984]

Fixed an issue in SPM where the Sample Code Naming Schema would use the original planned date to generate the SYS_SAMPLE_CODE instead of a revised date set on the Scheduling Task window.

 

 


 

 

SPM – Prevent Users from Editing Select Fields in Sample Overview Grid [d40546]

In the "Sample(s)" and "Preview Resulting Samples" tabs, the following fields are no longer editable:
  • PARENT_SAMPLE_CODE
  • SYS_LOC_CODE
  • SYS_SAMPLE_CODE
  • SAMPLE_NAME
This affects both Planned and Scheduled Tasks.

 

 


 

 

SPM – Skipping Month of Task End Date Prevents Preview of Task Schedule in Recurrence/Preview Tab [d41946]

Fixed a bug in SPM that would cause the Recurrence Preview window to not display a list of planned tasks when skipping the month of the recurrence end date while using a Daily or Weekly/Bi-Weekly/N-Weekly recurrence.

 

 


 

 

SPM – SPM Report 48827 – Extract Non-SPM Plan Related Reports [d40659]

Created the EarthSoft.Reports.Library.d39109.dll file to more easily manage reports that are standard within SPM but not directly associated with SPM. These reports include:
  • Exceedances by Facility
  • Report of Reports
  • EIA: Late Results 
  • EIA: LOR Validation 
  • EIA: New Locations
  • EIA: Overdue Results 
  • EIA: Overdue SDGs 
  • EIA: Past Max Turnaround Time 
  • EIA: Rejected EDDs 
  • EIA: Samples by type 
These reports were previously part of the EarthSoft.Reports.Library.48827.dll file. Previously published reports that have 48827 in the filename will still be accessible within EQuIS Professional; however, they will have [Outdated] appended to the filename to differentiate between each location.

 

 


 

 

SPM Completeness Report - Detailed – Include Unplanned Water Level Activities [d42436]

Updated the SPM Completeness Report - Detailed report to include unplanned water level activities in the report output (on the Water Levels Excel worksheet) when the "Include Unplanned Data" parameter is selected.

 

 


 

 

SPM Completeness Report - Detailed and SPM Completeness Table - Field Samples Reports – Enhanced Check for Field Sample Table [d40182]

The SPM Completeness Report Detailed Field Samples section and the Completeness Table - Field Samples Report have an enhanced accuracy when matching to the DT_SAMPLE table.

 

 


 

 

SPM Completeness Table - Activities Report – Indicate Required Fields [d42512]

Updated the SPM - Completeness Table - Activities report to make the Activity Type and Plan Code parameters required.

 

 


 

 

SPM Completeness Table - Equipment Activities Report – Status Not Needed to Run Report [d42001]

Updated the "SPM - Completeness Table - Equipment Activities" report so that the user does not need to select a Status for this report to return data.

 

 


 

 

SPM Enterprise – Land Access Page – Cannot Add Person to Points of Contact Tab [d40945]

Fixed bug that prevented the "Create Point of Contact" button on the Point of Contact Tab on the Land Access page from being enabled when SPM Enterprise is setup to store data in the DT_PERSON table.

 

 


 

 

SPM Enterprise – Scheduler Page – Editing Scheduled Tasks Updates Scheduled Tables [d40428]

Editing the start date for a scheduled task on the Scheduler page of SPM Enterprise will now update the task's activities and samples scheduled dates in the DT_SPM_SCHEDULED_TASK table as well as the DT_SPM_SCHEDULED_SAMPLE and DT_SPM_SCHEDULED_ACTIVITY tables.

 

 


 

 

SPM Enterprise – Scheduler Page – Scheduling Task No Longer Results in Missing Text and Buttons [d40881]

Fixed a bug that occurred when scheduling a task in SPM Enterprise using the Scheduler. The Tasks/Resources header and 'CLEAR SELECTION' button will now continue to be displayed and function correctly instead of disappearing.

 

 


 

 

SPM Enterprise – Scheduler Page – Tasks Scheduled for the Following Month Will Not Be Displayed [d41100]

Fixed an issue when opening the Scheduler Page in SPM Enterprise where tasks from the first day of the next month were listed in addition to tasks from the displayed month.

 

 


 

 

SPM Format – Add Default Mapping for MAGs [d42040]

Updated the SPM Format to be able to add METHOD_ANALYTE_GROUP_CODEs to the database (with the default mapping of METHOD_YN set to "N"). The lookup to rt_mth_anl_group in the following four sections now have a default mapping of "N" for method_yn to import this data:
  • DT_SPM_Contract_Mag
  • DT_SPM_Contract_Mag_Members
  • Planned_Sample_Result
  • Scheduled_Sample_Result

 

 


 

 

SPM Format – Updated Tooltips for "naming_schema_sample_name" Fields [d41229]

Updated the SPM_Plan.naming_schema_sample_name and Plan_Task_Commitment.naming_schema_sample_name tooltips to be "Sample name naming schema" instead of "Cost_unit".

 

 


 

 

SPM Spatial Completeness Summary Report – Wrong Completeness Status and 'Check by SPM sys_sample_code' Report Parameter Does Not Work [d40295]

The SPM Spatial Completeness Summary Report has an enhanced accuracy when matching to the DT_SAMPLE table. The report also provides functionality to the 'Check by SPM sys_sample_code' parameter.